Our Operation and Maintenance services are based on power plant asset management and our team is responsible for the execution of the commercial arrangements relating to power plants. We implement Work, Planing & Control (WPC) Management, Reliability Management, Outage Management, Material & Fuel Management, Efficiency Management and Operation Management in the integrated system to assure your asset is in a good condition. These are included power sales, fuel supply essential for the conduct of the business to a practice of collaboration with power sales customers in significant gains for both the power plants and their customers.
Operations and Maintenance


Asset Management Process

Operation
There are two ways of observation
- By instrumentation in the control room and
- Direct observations in the field.
The operator’s assignments in the control room
- In the control room the following quantities and methods, among other things, may be available for the operator in controlling the power plant operation daily
- Measured and calculated quantities in the display terminal
- Trends from the above-mentioned
- Periodical laboratory analyses: boiler water, steam, condensate water, feed water, ash analyses and other such control analyses, fuel counters
- Alarms of measurements, exceeding of limit values, damages, etc.
- Alarm printer, which prints out all messages and alarms to be examined later on.
The field operator’s most important assignments during his round in the Power Plant operation
The field operator will through inspection round and monitoring the equipment, during this round must take the following inspection measures control of the plant operation
The field operator will inform the operator and shift engineer immediately about the defects or unusual changes observed by him during his round, so that can take appropriate measures.
Maintenance
Activity to ensuring that physical assets continue to do what their users want them to do and keep the optimum function of the equipment as well as it begin by reducing damage in early detection.
Activities to ensuring that plant assets condition will continue to fulfill their function by doing several assessments take base on critical parts and using proper method as per manufacturer manual or related international standard
Maintenance and Inspection Goal Target:
- Performance optimization with safe condition at operation
- High system reliability and availability
- Recorded periodic maintenance data monitoring and cost reduction
- Improve downtime while take corrective action
- Doing continuous improvement that will lead to better performance of maintenance activity