Assessment

Performance analysis by comparing the equipment requirements as stated in the document with the actual condition with reference to a specified design.

The equipment’s shall be including the following, but not limited to:

  1. Steam Generator and its Auxiliary
  2. Steam Turbine and its Auxiliary
  3. Generator and its Auxiliary
  4. Balance of Plant
  5. Electrical System
  6. Instrument and Control System
  7. Maintenance Equipment, etc
OLYMPUS DIGITAL CAMERA
Pengambilan data vibrasi dan temperatur motor Conveyor no. 1